Our movie and video library can only be streamed or downloaded by members only
Continue to watch for FREE ➞It takes less then 1 minute to Sign Up, then you can enjoy Unlimited Movies & TV titles.
On the Critical Path 1971 Free Unlimited Access
Nuclear power plants are not exactly sold on the same scale as wheat, but that they can be manufactured as an exportable commodity is well illustrated in this film. For those familiar with nuclear power generation, and even for the lay audience, this is a lucid exposition of how a nuclear power plant is put together. The film shows the machining and assembly of principal components, and the "on power" operation of the Canadian plant at Pickering, Ontario. Produced by the NFB for Atomic Energy of Canada Limited.
Genre: Documentary
Cast:
Crew: Dennis Sawyer (Producer), Kenneth McCready (Script), Bernard Bordeleau (Sound Editor)
Studio: ONF | NFB
Runtime: 22 minutes
Quality: HD
Release: Jan 01, 1971
Country: Canada
Language: English